目前正在编制标书,在一个合同文本出现additional flexibility is required as a result of CONTRACTOR's request to modify by more than 10% the maximum slope of the Planned Overall SUBCONTRACT Progress Curve though circumstances. 这里的 maximum slope of the Planned Overall SUBCONTRACT Progress Curve怎么理解和进行计算,请各位计划高人予以指点!